New product
All hoses and small parts for the GUE configuration according to Derk Remmers (GUE JJCCR Instructor)
Warning: Last items in stock!
Availability date:
The following hose configuration refers to the use of the Scubapro MK 25 AF or Halcyon 1st stage H75 P with the 5th medium pressure outlet on the head.
Attached you find pictures for better understanding
T-Piece exhalation side
MD 20cm- to MAV
Left valve:
MD 100cm MF to BOV
HD 65cm MF Extreme
Right valve
MD 56 cm to ADV MF
Inflator 56 cm to the Wing (Rubber) (Is included in the Halcyon JJ-Wing!)
MD 210cm Rubber long pants with Boltsnap
Oxygen
HD hose 100 cm Miflex HD to O2-Fini
MD tube 40 cm MF
Inflator hose 56 cm MF to MAV
MD tube 40 cm MF to solenoid (x)
1 x medium pressure distributor T-piece
1 overpressure valve 10 bar
1 pair screws SS to fix the backplate to the frame
The 20`Years Halcyon Anniversary Carbon-Backplate!
Steeltanks without Valve, Eurocylinders,
light 7 and 12 Liter Steeltanks without Valve, Faber
Deepstop Argonset wit Halcyonstraps
JJ-Valveset
OFFSET ADAPTER FOR JJ-CCR / SHEARWATER HUD HOLDER FOR DSV/BOV, TYPE 2
Scubapro MK 25 EVO DIN 1. Stage DIN
Scubapro G260 2. Stage